The unit behind the minimum
Meters, reels and finished pieces
An LED strip minimum order quantity belongs to a stated unit and supply scope. It may concern meters of a selected source, complete reels, prepared pieces or an agreed assembled part. A reel's packaging length and the minimum commercial order are different fields.

VST's wholesale strip page describes a general starting point of around 500 meters. Circuit choice, stock position and preparation or packaging requirements affect the actual minimum quoted for the order. The quotation for the selected configuration establishes the applicable quantity basis.
Establish the item first. A quotation for source tape is not automatically a quotation for the same number of completed, ended light sections.
Per-variant quantities and the total order
CCT, voltage and preparation lines
An order can contain several distinct variants. White tone, voltage, circuit, protective construction or prepared leads can change the supplied item. Read whether the quoted minimum applies to the whole order, each identified variant or another stated grouping.
| Requested item | Unit to identify | Quantity to show | Rule to read |
|---|---|---|---|
| A selected source reel | Meters and reel basis | Source length ordered | Whether the minimum concerns that variant or a wider order |
| Another white or voltage option | Its own quoted unit | Its separate quantity | Whether this line can be combined with the first |
| Prepared light sections | Completed pieces and defined part | Number of each prepared item | The minimum and any packing multiple for that scope |
One total order and several separate requirements
A combined total can hide a shortfall in one line. If the terms require a minimum per variant, adding unrelated items does not necessarily satisfy it. Conversely, a documented order-wide rule should not be silently interpreted as a separate minimum for every line.
Apply the quotation's stated grouping. Counting every piece of tape in the project together may combine products that have separate order requirements.
Stock, preparation and a new circuit are different orders
An existing product route
An existing configuration and a new development do not have the same supply scope. Where a particular stocked option is confirmed, its available order unit and terms can answer the immediate need. A stock reference for another variant does not establish availability for yours.

Changed leads, labels, board or circuit
Prepared lengths, connections and packaging add their own defined work. A changed board or circuit can introduce another development scope again. VST's strip-manufacturing page distinguishes source and customization fields for these discussions.
Keep the resulting supplied part identifiable. The custom-strip specification guide develops its complete dimensions and interfaces. Those fields define what the quantity refers to; they do not, by themselves, set the applicable order minimum.
A short order-split example
Stated illustrative quantity terms
Assume, only for this example, that a quotation requires 100 finished pieces per variant. The buyer requests 60 warm-white pieces and 60 neutral-white pieces. These are hypothetical terms and quantities, not a VST MOQ offer.
The result for two requested variants
The total is 120 pieces, but each variant is 40 pieces below its own assumed minimum. Combining the two lines into a larger headline total does not meet that particular rule. Meeting it without another agreement would require 100 pieces of each variant, or 200 pieces in total.
The buyer can accept the extra inventory if it is wanted, compare a confirmed alternative supply route, or obtain different agreed terms. An initial sample or a tooling payment should not be assumed to change the minimum unless the applicable offer says so.
Choosing a supply route within the quantity limits
Keep the required variants or revise the route

| Required item | Route to compare | Quantity basis to retain | Remaining specific condition |
|---|---|---|---|
| An existing configuration | Confirmed stock or standard supply | The identified quoted unit | Actual availability and terms |
| A prepared light part | The specified ended section | Quantity of each complete part | Preparation and packing scope |
| A changed circuit or board | The defined development proposal | Each agreed resulting configuration | Development and production terms |
Record the order unit and specific scope
Once the route is selected, keep its unit and variant quantities clear in the order. MOQ, packing multiples, price breaks and delivery timing should each retain their own meaning.
The strip-cost guide handles price and usable-length comparisons. For the quantity decision, identify the supplied items and apply the stated minimum to their requested split.