Factory conversion planning
200W UFO LED high bay light for your factory upgrade
- The VST-HBL-200WF platform is published at 30,000 lm at full power.
- 200W, 150W and 120W settings support a defined commissioning plan.
- Optical, control and mounting choices can be matched to the conversion scope.
Conversion priorities
Check what the upgrade must fit
Describe the existing system
Identify the fittings, their spacing and how they are switched. Include any areas where shadows, glare or poor coverage already affect work.
Plan access during production
Record the routes and shutdown windows available to installation equipment. A practical proposal must fit the way the facility can be accessed.
Choose a trial area
Choose a trial bay with the tasks and surrounding surfaces found on your production floor. Testing elsewhere may miss the problems the conversion needs to solve.
Keep a commissioning record
Identify the final power setting and control grouping by location. Future maintenance is easier when the installed arrangement is documented clearly.

Upgrade support
Answer the site questions before changeover
Existing-layout assessment
Send your current fitting positions and task requirements. VST can develop a DIALux proposal and identify where the layout needs adjustment.
Electrical configuration discussion
The electrical engineering team can address the intended control interface and driver choice. Supply circuit and controller details before a version is selected.
Output verification
Request electrical and photometric measurements for the sample version you are evaluating, so the lighting proposal uses data for that configuration.
Coordinated order preparation
For a staged conversion, discuss quantity, identification and packing by installation area so the order documents support the sequence of work.
Conversion basis
Compare the installation, not only lamp wattage
Verified 200W model
Review the conversion platform
Implementation support
From site assessment to delivered units
Lighting simulation
Use a proposed layout to examine the working areas affected by conversion. It provides a reasoned starting point for fixture quantity and distribution.
Quality stages
Material checks continue through assembly and outgoing inspection. The agreed version defines the product that must be kept consistent through production.
Control options
Select the listed interface that suits the project. Matching the driver to the controller is a separate step from choosing nominal power.
Delivery identification
Agree product and carton identification for each installation area. This helps the team sort fixtures when replacement work takes place in several stages.
Fixture construction
Three parts that affect the conversion

Visible quality
LED source

Distribution control
PC optical lens

Thermal path
Aluminum heat sink
Supply relationship
Meet the team supporting the conversion
Meet the VST team
The introduction presents VST's work. For your factory conversion, agree who will handle the sample, project documents and delivery arrangements before production begins.
Customer experience
The customer describes their cooperation with VST. Discuss the communication needed for your shutdown, especially who will resolve outstanding questions before installation starts.
Conversion environments
Assess the task before choosing the layout

Machining workshops

Parcel sorting halls

Indoor dispatch areas

Fleet service workshops

Technical training halls
Start the assessment
Show us the fittings you want to replace
200W technical data
Check the model against the site
| Parameter | Published value |
|---|---|
| Model Number | VST-HBL-200WF |
| Power Consumption | 200W (DIP adjustable: 200W / 150W / 120W) |
| Luminous Flux | 30,000 lm (150lm/w) |
| Input Voltage | 100–277V AC 50/60Hz |
| Power Factor | >0.95 |
| LED Chip | Philips Lumileds |
| LED Driver | Sosen |
| CCT & CRI | 3000K / 4000K / 5000K / 5700K / 6500K; CRI >80 |
| Beam Angle | 60° / 90° / 120° |
| Dimensions | Φ300 × H176 mm |
| Housing Material | Die-cast aluminium |
| Type of Cover | PC lens; aluminium or PC lampshade optional |
| Ingress Protection Rating (IP Rating) | IP65 |
| Impact Resistance Rating (IK Rating) | IK08 |
| Total Harmonic Distortion (THD) | <15% |
| Surge Protection | 6kV |
| Dimming Option | 0-10V / 1-10V / PWM / TRIAC / ZigBee / Sensor |
| Working Temperature | -40°C to +60°C |
| Lifetime | 50,000 hours |
| Warranty | 5 Years |
Working feedback
Comments from order discussions
Production arrangements
Prepare the commercial side of the conversion
Before the changeover
200W conversion questions
| Check | Keep consistent |
|---|---|
| Working-plane light | Measurement points and task height |
| Visual comfort | Normal occupied sightlines |
| Controls | Controller version and operating sequence |
| Site conditions | Daylight and surrounding equipment |


